BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20231018T190000Z
DTEND:20231018T200000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Hwy 14/Broadway Avenue Intersection Reconstruction Info Session
DESCRIPTION:The Rochester Area Chamber of Commerce will host an information session with the Minnesota Department of Transportation on the upcoming Highway 14/Broadway Avenue Intersection project with construction slated to begin in the summer of 2027. \n\n\n\nIn 2027\, the Hwy 14 and Broadway Ave. intersection in Rochester will receive safety improvements. Every day\, almost 50\,000 vehicles use the intersection. MnDOT and the City of Rochester are looking into changes to reduce crashes and improve crossings for pedestrians and bicyclists.\n\n\n\nThe team is looking into these changes:\n\n\n	Alter some or even all turning lanes\n	Reduce speeding\, especially on Broadway Ave.\n	Resurface Broadway Ave. to 9th St.\n	Adjust crosswalks and install new sidewalks/trails\n	Upgrade ADA facilities\n	Replace traffic signals\n	Improve lighting\n\n\nThe project will span west and east on Hwy 14 from 4th Ave. SW to 3rd Ave. SE and north and south from 9th St. SE to the access points north of 14 St. SW. Some portions of this project will include a reconstruction\, where all the materials of the road are removed and replaced with new ones.\n\n\n\nJoin us for an information session on Wednesday\, October 18th from 2:00-3:00pm at the Rochester Area Chamber of Commerce.\n\n\n\nTo learn more about the project\, visit https://talk.dot.state.mn.us/hwy-14-and-broadway-ave-intersection-safety-improvements
X-ALT-DESC;FMTTYPE=text/html:<p><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">The Rochester Area Chamber of Commerce will host an information session with the Minnesota Department of Transportation on the upcoming Highway 14/Broadway Avenue Intersection project with construction slated to begin in the summer of 2027. </span></span></span><br />\n<br />\n<span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">In 2027\, the Hwy 14 and Broadway Ave. intersection in Rochester will receive safety improvements. Every day\, almost 50\,000 vehicles use the intersection. MnDOT and the City of Rochester are looking into changes to reduce crashes and improve crossings for pedestrians and bicyclists.</span></span></span><br />\n<br />\n<span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">The team is looking into these changes:</span></span></span></p>\n\n<ul>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Alter some or even all turning lanes</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Reduce speeding\, especially on Broadway Ave.</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Resurface Broadway Ave. to 9th St.</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Adjust crosswalks and install new sidewalks/trails</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Upgrade ADA facilities</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Replace traffic signals</span></span></span></li>\n	<li><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Improve lighting</span></span></span></li>\n</ul>\n\n<p><span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">The project will span west and east on Hwy 14 from 4th Ave. SW to 3rd Ave. SE and north and south from 9th St. SE to the access points north of 14 St. SW. Some portions of this project will include a reconstruction\, where all the materials of the road are removed and replaced with new ones.</span></span></span><br />\n<br />\n<span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">Join us for an information session on Wednesday\, October 18<sup>th</sup>&nbsp\;from 2:00-3:00pm at the Rochester Area Chamber of Commerce.</span></span></span><br />\n<br />\n<span style="color:black\;"><span style="font-family:arial\,sans-serif\;"><span style="font-size:12.0pt\;">To learn more about the project\, visit <a href="https://talk.dot.state.mn.us/hwy-14-and-broadway-ave-intersection-safety-improvements">https://talk.dot.state.mn.us/hwy-14-and-broadway-ave-intersection-safety-improvements</a> </span></span></span></p>\n
LOCATION:Rochester Area Chamber of Commerce 220 Broadway Ave. S. Ste. 100 Rochester\, MN 55904
UID:e.1427.1515606
SEQUENCE:3
DTSTAMP:20260509T221308Z
URL:http://business.rochestermnchamber.com/events/details/hwy-14-broadway-avenue-intersection-reconstruction-info-session-1515606
END:VEVENT

END:VCALENDAR
